Privious Exam Paper of DAE

Privious Exam Paper of Surveying & Leveling

Khyber PakhtunKhwa Board of Technical Education Peshawar

Diploma of Associate Engineer

Ist Year Architecture Technology (New Course)

Annual Examination 2012

Paper: - Surveying & Leveling  (AR-154)

-----------------------------------------------------------------------------------------------------------------------

Note: -             Part – A is compulsory .It should be attempted on the question paper & returned after 30

minutes. Cutting, Erasing, overwriting & use of pencil is not allowed.

Time: -            30 Minutes                                         (Part – A)                                           Marks: - 20

Q.1: -   I           Fill in the Blanks.

  1. A survey in which curvature of earth is taken into account _______________.
  2. An art to collect data and representing it on a map is called _____________ .
  • The length of one link of guntrs chain _____________.
  1. Handles are connected to the links by _____________ .
  2. ______________ is an instrument used for measuring bearings.
  3. W.C.B and R.B are always equal in _______________ quadrant.
  • Trough compass is used to mark ___________ on the sheet or plane table.  
  • Plane table survey is suitable for ___________ .
  1. There are ____________ types of bench marks.
  2. The first reading of staff on a point or bench is called ___________.

 

******************************

 

Khyber PakhtunKhwa Board of Technical Education Peshawar

Diploma of Associate Engineer

 Ist Year Architecture Technology (New Course) Annual Examination 2012

Paper: - Surveying & Leveling (AR-154)

-------------------------------------------------------------------------------------------------------------------------------

Time Allowed: -         02 ½ Hours.                            ( Part – B )                                         Marks: - 80

 Note: -            Attempt any five questions. Each question carry equal marks.

Q.2: -               What does surveying mean? Write the principles of surveying?   

 

Q.3: -               The length of the line is measured with engineers chain as 1500 ft. It was after wards found

that the chain was 7 inches too long. Find the true length of the chain?

 

Q.4: -               Define the followings.

  1. i) G.T.S bench Mark. ii) Permanent Bench Mark  

                        iii) Back sight                          iv) Reduced Level                  v) Station Point

 

Q.5: -               Explain in detail Bearing and types of bearing? (Draw figure also).

Q.6: -               Find the Reduce bearing from the given W.C.B

                        AB = 49° – 30′                        DE = 133° – 45′

                        BC = 310 – 15′                       EF = 167° – 30′

                        CD = 210° – 30′                      FG = 92° – 45′

Q.7: -               Explain  in detail the instruments used in plane table survey?

Q.8: -               The following consecutive reading were taken with a level and a 4m staff on consecutive

sloping ground at a common interval of 30m.

0.52 on A, 0.86, 1.76, 2, 02, 3.86

4.00, 1.84, 2.67, 3.58, 3.85, 0.69

1.98, 2.38 on B. The elevation of point A was 220.45. Determine the gradient of the line

AB and R.Ls of all points?